Fairport Group
Project Engineering Division
   





















 
   
RMC Aggregates UK Ltd : Doveholes Mortar Plant : Date 2002
 

Designed to process 50t/h of limestone dusts the process included a de-dusting screen, fluid bed dryer and silos for storage and blending. After mixing the products were loaded to road transport. A computer control system allowed minimal manpower for operation and the flexibility to produce up to 50 different recipes.

 

<<Case Study Index