Fairport Group
Project Engineering Division
   





















 
   
British Plaster Board : East Leake (2006)
 

Storage and transportation of raw gypsum through to the stucco making process. The project includes design and supply of equipment, installation, testing and commissioning.

 

<<Case Study Index