Lytag : Drax Power Station

Lytag : Drax Power Station

The design and build of a new Lightweight Aggregate (LWA) plant for Lytag established at Drax Power Station to make use of the supply of Pulverised Fly Ash (PFA) which is the major constituent part of LWA. A full turnkey project was delivered in less than 12 months allowing the sale of a range of […]

Lafarge : Hope Works

650t/h single line secondary and tertiary crushing and screening system complete with 30,000t toast rack ground storage system for outloading to road, asphalt and concrete plants.

Tarmac: Holme Hall Quarry

650t/h single line secondary and tertiary crushing and screening system complete with 30,000t toast rack ground storage system for outloading to road, asphalt and concrete plants.

Cornelly Quarry Toastrack Storage

Following on from the 1000t/h “fast-track” Stocking & Sinter plant commissioned in 1996, Fairport undertook the feasibility study for a new 650t/h Final Screening & Storage system before winning the competitive tender to design and build the plant for Tarmac, which came on stream in 2003.