Tilbury Power Station
Unloading at 2,500t/h Pelletised Biomass from two new Ship Unloaders and then using inline Elutriators to de-dust the pellets before transport via the modified existing belt conveying system to the boiler bunkers. The dust is separately transported by pneumatic conveyors to new dedicated dust storage silos alongside the existing bunker house.
The project included the design, supply, install, testing and commissioning of the mechanical and structural works.